This was a challenging installation. EIT Zollner was relocating and the subfloor in the new building was in poor shape, with cracks, swales and moisture problems. Repair and floor prep would have been extremely costly. Using GroundLock interlocking tile, BG Floors was able to go directly over the old subfloor with minimal preparation. Along with saving money for the client, installing GroundLock directly over the subfloor helped to expedite the renovation schedule.
Phase 1
Phase 2
Project Specifications
Company
Application
Electronics Manufacturing
Color
Light and medium gray
Installer
BG Floors
Total Area
69,000 sq. ft.