Project Overview
The facility had problems with their floor. To avoid removing the old floor and disrupting operations, St. John Services & Installation installed the GroundLock tiles directly over their current vinyl tile.
The Challenge
Cox Communications needed to address flooring problems in their main server room without disrupting critical telecommunications and home automation services.
The Solution
GroundLock Extreme Interlocking ESD Tile was installed directly over the existing vinyl tile, eliminating the need for demolition and minimizing downtime.
Project Results
Successfully protected 2,700 square feet of server room space while maintaining continuous operations of wifi, cable, and internet services.
Pre-installation
This old floor was installed over to avoid disrupting operations
During installation
New Installation
Results & Benefits
Project Specifications
Company
Application
Telecommunications and Home Automation Services (Wi-Fi, cable, internet) – Main server room
Color
Light Gray
Contractor
St. John Services and Installation
Total Area
2,700 sq. ft.