Project Overview

The facility had problems with their floor. To avoid removing the old floor and disrupting operations, St. John Services & Installation installed the GroundLock tiles directly over their current vinyl tile.

The Challenge

Cox Communications needed to address flooring problems in their main server room without disrupting critical telecommunications and home automation services.

The Solution

GroundLock Extreme Interlocking ESD Tile was installed directly over the existing vinyl tile, eliminating the need for demolition and minimizing downtime.

Project Results

Successfully protected 2,700 square feet of server room space while maintaining continuous operations of wifi, cable, and internet services.

Pre-installation

This old floor was installed over to avoid disrupting operations

During installation

New Installation

icon

No Demolition

Installed directly over existing flooring without removal

icon

Continuous Operations

Server room remained operational throughout installation

icon

Telecommunications Ready

ESD protection for sensitive networking equipment

icon

Quick Installation

Interlocking system minimized installation time and disruption

Project Specifications

Application

Telecommunications and Home Automation Services (Wi-Fi, cable, internet) – Main server room

Color

Light Gray

Contractor

St. John Services and Installation

Total Area

2,700 sq. ft.