Project Overview

This was a fast-track project, with no time to install a vapor barrier. We helped the client choose a concrete additive that helped them install AmeriWorx ESD vinyl tile before the concrete was completely cured.

The Challenge

The aerospace manufacturing facility needed to install ESD flooring on a fast-track schedule with no time for traditional vapor barrier installation and concrete curing.

The Solution

AmeriWorx Conductive Vinyl Tile was installed using StatBond Pressure-sensitive adhesive, along with a special concrete additive that allowed installation before complete curing.

Project Results

Successfully installed 100,000 square feet of ESD vinyl tile on an accelerated schedule without compromising performance or requiring facility downtime.

icon

Fast-Track Installation

Innovative concrete additive allowed installation before full cure time

icon

No Vapor Barrier Needed

Special installation method eliminated need for traditional vapor barrier

icon

Massive Scale

100,000 square foot project completed on aggressive timeline

icon

Zero Downtime

Installation process allowed continuous facility operations

Project Specifications

Company

Aerospace Manufacturing

Application

Electronics Manufacturing (Aerospace and defense)

Color

Spring Snow

Contractor

Appleby & Horn Tile Co.

Total Area

100,000 sq. ft.

Installation Method

StatBond Pressure-sensitive adhesive