Project Overview
During this project we worked directly with the business owner, bringing in a contractor — Epoxy Solutions, Neenah – for turnkey installation.
The Challenge
Burton EMS, a contract manufacturing and assembly facility serving various sectors in the electronics industry, needed comprehensive ESD flooring solution.
The Solution
GroundWorx Ultra Generation 3 ESD Coating in Light Gray was selected and installed through a turnkey arrangement with Epoxy Solutions.
Project Results
Completed 8,000 square feet of ESD epoxy flooring with direct support from StaticWorx throughout the project.
Results & Benefits
Project Specifications
Company
Location
Ironwood, MI
Application
Contract Manufacturing and Assembly (Serves various sectors in the electronics industry)
Color
Light Gray
Contractor
Epoxy Solutions, Neenah, WI
Total Area
8,000 sq. ft.